Hi colleagues, I need ideas on methods of pre-concentration before i feed a knelson concentrator. I operate a 90tph SAG mill, with A KC on the circulating load. My Kc feed, cyclone UF ranges around 5g/t but i would like to upgrade this before i feed the KC. Any ideas of how i can achieve this? Its a gold operation by the way.