Started by
Bob Mathias There is a strong push in the research community on optimistic energy efficiency through measuring minimum energy is required for comminution and benchmarking energy efficiency of different sites. On the other hand there are people who think optimizi...
Started by
Bob Mathias A complex analysis at a pilot plant scale is very hard to duplicate in actual production. I'm not sure you can avoid the trial and error method. The bottom line is the kilowatt hours per ton required to achieve maximum recovery. Several SAG mills ha...
Started by
Maya Rothman Hi,
Am I working on a Antimonite/Stibnite Ore Project (scoping) and I need Bond Work Index values. I do not have a lab not equipment at hand. What is a good estimate?
Thanks
Started by
Paul Morrow A LIBS On-Stream-Analyzer VS XRF- X-Ray OSA On-Stream-Analyzer are similar in that they are used for elemental analysis, but LIBS can measure the light elements where XRF struggles. LIBS are generally much faster in all cases, an analysis can ...
Please join and login to participate and leave a comment.
In conventional base metal milling throughput always trumps recovery for maximizing revenue. This has been demonstrated over and over again. TPD also trumps energy efficiency, especially when the pla...