- To participate in the 911Metallurgist Forums, be sure to JOIN & LOGIN
- Use Add New Topic to ask a New Question/Discussion about Hydrometallurgy.
- OR Select a Topic that Interests you.
- Use Add Reply = to Reply/Participate in a Topic/Discussion (most frequent).
Using Add Reply allows you to Attach Images or PDF files and provide a more complete input. - Use Add Comment = to comment on someone else’s Reply in an already active Topic/Discussion.
Please join and login to participate and leave a comment.
In a review of an existing gold operation the PFD shows their SART circuit after the CIP and cyanide thickening circuits. As CNCu complexes are an issue can the SART circuit be placed after the leach circuit and before the CIP circuit?